6.) Close the load plate (A), then push the load lever (B) until it snaps into the retention tab. (Fig.
2-3.6) The CPU fits in only correct orientation.
1. Unplug the power cord from the wall socket before touching any component.
2. DO NOT force the CPU into the socket to prevent bending the connectors on the
socket and damage the CPU!
2-3-2. The heat sink and fan installation
1.) Place the heat sink
on the top of the installed CPU, making sure that the four fasteners match
the hole of platform.
2.) Push down two fasteners at a time in a diagonal sequence to secure the heat sink and fan
assembly in place.